Projects Summary
Project Name | Location | Client Name / Contact Number | Duration | Complete Date |
---|---|---|---|---|
Dioko Resort and Ecotourism Park | Brgy San Joaquin San Pablo City Laguna | |||
LAND DEVELOPMENT, CONSTRUCTION OF ENTRANCE GATE, MULTI PURPOSE BUILDING AND PERIMETER FENCE AT MUTUAL HOMES PUSIL | Brgy. Pusil, Lipa City, Batangas | AFP-MBAI / Col. Bonny Serrano cor., E. delos Santos Avenue, Quezon City | 6 MONTHS | MAY 27, 2013 |
CCBP Canlubang Plant Construction of Injection Machine Room - Alpla Building | CANLUBANG, LAGUNA | COCA-COLA BOTTLERS PHILS, INC. 27th FLOOR, NET LIMA BUILDING, 5th AVENUE COR. 26th STREET BONIFACIO GLOBAL CITY, TAGUIG CITY | 90 CALENDAR DAYS | November 2014 |
CCBP CANLUBANG PLANT CONSTRUCTION OF 2 UNITS CISTERN TANK | CANLUBANG, LAGUNA | COCA-COLA BOTTLERS PHILS, INC. 27th FLOOR, NET LIMA BUILDING, 5th AVENUE COR. 26th STREET BONIFACIO GLOBAL CITY, TAGUIG CITY | 60 CALENDAR DAYS | January 2015 |
CCBP MISAMIS ORIENTAL PLANT CONSTRUCTION OF INJECTION BUILDING | VILLANUEVA, MISAMIS ORIENTAL | COCA-COLA BOTTLERS PHILS, INC. 27th FLOOR, NET LIMA BUILDING, 5th AVENUE COR. 26th STREET BONIFACIO GLOBAL CITY, TAGUIG CITY | 120 CALENDAR DAYS | December 2014 |
CCBP CANLUBANG PLANT WAREHOUSE EXPANSION | CANLUBANG, LAGUNA | COCA-COLA BOTTLERS PHILS, INC. 27th FLOOR, NET LIMA BUILDING, 5th AVENUE COR. 26th STREET BONIFACIO GLOBAL CITY, TAGUIG CITY | 90 CALENDAR DAYS | June 2015 |
Five-Storey Hospital Extension | C.P. REYES HOSPITAL, Tanauan City, Batangas | TANAUAN MEDICAL CENTER INC. / J.P. Laurel Highway, C. P. Reyes Hospital, Tanauan City Batangas | 180 calendar days | MARCH 23, 2013 |
Extension & Renovation of Greenfields Integrated School Building | San Lorenso South Villa Segovia, Brgy. Dita, Santa Rosa City, Laguna | GREENFIELDS INTEGRATED SCHOOL, San Lorenso South, Villa Segovia, Brgy. Dita, Santa Rosa City, Laguna | 75 calendar days | APRIL 18, 2013 |
Construction of Drainage Extension | Lipa City, Batangas | LIMA LAND INC. / Bldg. B, LIMA Square, Business Loop, LIMA Technology Center, Malvar - Lipa City, Batangas | 60 CALENDAR DAYS | COMPLETED |
Cosmo Medical, Inc. Factory Building | Malvar, Batangas | COSMOMEDICAL, INC. / FTI Taguig City, Metro Manila | 150 calendar days | NOVEMBER 30, 2013 |
Five Storey Hospital Building with Basement | C. Raymundo Avenue, Maybunga, Pasig City, Metro Manila | TRICITY MEDICAL CENTER INC. / 269 C. Raymundo Avenue, Maybunga, Pasig City, Metro Manila | 303 calendar days | December 11, 2014 |
KCD TECHNICAL INSTITUTE | Alaminos, Laguna | 180 calendar days | july 2013 |
Project Name | Location | Client Name / Contact Number | Duration | Complete Date |
---|---|---|---|---|
eastgate maritime training center and dormitory building | Brgy. Salitran IV Dasmarinas Cavite | Equinox Land Corp. | 300 calendar days | september 2017 |
Project Name | Location | Client Name / Contact Number | Duration | Complete Date |
---|---|---|---|---|
CCBP- DAVAO PLANT SITE DEVELOPMENT | Brgy. Darong Sta Cruz, Davao Del Sur | March 2017 | ||
Greenfields Integrated School Building Extension | San Lorenzo South Villa Segovia, Brgy. Dita, Santa Rosa City, Laguna | GREENFIELDS INTEGRATED SCHOOL, San Lorenzo South, Villa Segovia, Brgy. Dita, Santa Rosa City, Laguna | 75 calendar days | June 2016 |
CCBP Ilo-Ilo Plant Warehouse Extension | Brgy. Ungka II, Favia, Ilo-Ilo City | NC 27th Floor, Net Lima Building, 5th Avenue cor. 26th Street Bonifacio GlobalCity, Taguig City | 90 calendar days | On-Going |
CCBP BACOLOD Plant Warehouse Extension | CCBP Bacolod Plant | COCA-COLA BOTTLES PHILS, INC 27th Floor, Net Lima Building, 5th Avenue cor. 26th Street Bonifacio GlobalCity, Taguig City | 90 calendar days | On-Going |
CCBP Misamis Oriental Plant Construction of Concentrate Ambient Room | Villanueva, Misamis Oriental | NC 27th Floor, Net Lima Building, 5th Avenue cor. 26th Street Bonifacio GlobalCity, Taguig City | 90 calendar days | On-Going |
ORTIGAS HOSPITAL & HEALTHCARE CENTER, 7-Storey Hospital Building with Roofdeck | Cainta, Rizal | ORTIGAS HOSPITAL & HEALTHCARE CENTER,Ortigas Ave., Extension, Barangay Sto.Domingo, Cainta, Rizal | 365 calendar days | On-going |
Assumption Specialty Hospital and Medical Center | Antipolo City | Assumption Specialty Hospital and Medical Center, Inc., Sumulong Hi-way, Brgy. Dela Paz. Antipolo City | 365 calendar days | On-Going |
Eastgate Maritime Training Center and Dormitory Building | Salitran, Dasmarinas, Cavite | EQUINOX LAND CORP., Salitran, Dasmarinas, Cavite | 360 calendar days | On-Going |
CCFP ILOILO PLANT WAREHOUSE EXTENSION | Brgy Ungka II, Pavia Iloilo City | 90 calendar days | December 2016 | |
MODEL HOUSE AT LA TIERRA VERDE MUTUAL HOMES AND GRAND VIEW MUTUAL RESIDENCE | Catalan Davao City | 60 CALENDAR DAYS | feb 2016 |
Project Name | Location | Client Name / Contact Number | Duration | Complete Date |
---|---|---|---|---|
Integrated Montessori Center | Bayani Rd. Fort Bonifacio, Taguig City | 270 calendar days | june 2016 | |
CCBP Canlubang Haulers Parking | Canlubang, Laguna | COCA-COLA BOTTLES PHILS, INC 27th Floor, Net Lima Building, 5th Avenue cor. 26th Street Bonifacio GlobalCity, Taguig City | 60 calendar days | Dec 2015 |
CCBP Canlubang Dock Leveller | Canlubang, Laguna | COCA-COLA BOTTLES PHILS, INC 27th Floor, Net Lima Building, 5th Avenue cor. 26th Street Bonifacio GlobalCity, Taguig City | 60 calendar days | Oct 2015 |
CCBP Misamis Oriental Plant Warehouse Expansion (96mx38m) | Villanueva, Misamis Oriental | COCA-COLA BOTTLES PHILS, INC 27th Floor, Net Lima Building, 5th Avenue cor. 26th Street Bonifacio GlobalCity, Taguig City | 120 calendar days | Jan 2016 |
CCBP Davao2 Plant Hauler Parking Concreting | Davao Del Sur | COCA-COLA BOTTLES PHILS, INC 27th Floor, Net Lima Building, 5th Avenue cor. 26th Street Bonifacio GlobalCity, Taguig City | 90 calendar days | June 2015 |
CARMONA HOSPITAL & MEDICAL CENTER, 6 Storey Hospital Building with Basement | Governor's drive, Macaria Business Center, Carmona, Cavite | CARMONA HOSPITAL & MEDICAL CENTER INC., Macaria Business Center, Governor's drive cor. Purification St., Brgy. Sala, Cabuyao, Laguna | 180 calendar days | Dec 2015 |
FIRST CABUYAO HOSPITAL & MEDICAL CENTER, 6 Storey Hospital with Basement | Cabuyao, Laguna | FIRST CABUYAO HOSPITAL & MEDICAL CENTER INC., National Road, Brgy. Sala, Cabuyao, Laguna | 300 calendar days | On-Going |
INTEGRATED MONTESSORI CENTER, 6 Storey with Mezzanine | Bayani Road. Fort Bonifacio, Taguig City | INTEGRATED MONTESSORI CENTER,INC., 51 Diego Silang St., Phase 2 AFPOVAI, Fort Bonifacio, Taguig City | 270 calendar days | June 2016 |
AFP-MBAI, Construction of one(1) Model House each at La Tierra Verde Mutual Homes and Grand View Mutual Residences Subd. | Barangay Pusil, Lipa City, Batangas and Catalunan Grande, Davao City | ARMED FORCES AND POLICE MUTUAL BENEFIT ASSOCIATION INC., Col. Bonny Serrano cor., E. delos santos Ave., Quezon City | 60 calendar days | Feb 2016 |
AFP-MBAI, Repair works of the Multi-purpose halland restoration of the damaged fence & road | Barangay Pusil, Lipa City, Batangas | ARMED FORCES AND POLICE MUTUAL BENEFIT ASSOCIATION INC., Col. Bonny Serrano cor., E. delos santos Ave., Quezon City | 60 calendar days | Feb 2016 |
CARMONA HOSPITAL & MEDICAL CENTER | Carmona Cavite | 180 calendar days | December 2015 |
Project Name | Location | Client Name / Contact Number | Duration | Complete Date |
---|---|---|---|---|
Bagong Santa Rosa Village II | ||||
San Pedro, Laguna | ||||
Single Detached Model Houses | ||||
Fujitsu Die-tech Phils., Inc. | ||||
Innotech School Santa Rosa | ||||
M.A. Technology Inc. | ||||
Sohbi-Kohgei Phils., Inc. | ||||
Water Tank | ||||
Clubhouse | ||||
CM-TDK Phils, Inc. | ||||
Coca Cola Bottlers Phils. Inc | Coca Cola Bottlers Phils. Inc - Cebu Raw Water Cistern & Transformer Platform | |||
Estela Mercado Medical Plaza | ||||
Ford Motors Phils., Inc Assembly Plant | ||||
Mutual Homes, Zarraga, Iloilo | ||||
Avida Residences Bridge | ||||
FPIP-PDMC Leasing Building (Aikawa Philippines, Inc.) | ||||
Sta. Rosa De Lima Church Belfry |
Project Name | Location | Client Name / Contact Number | Duration | Complete Date |
---|---|---|---|---|
TRICITY MEDICAL CENTER | Raymundo Avenue Maybunga Pasig City | 300 calendar days | December 2014 | |
Starlights Training Facility | Brgy. Buck Estate, Alfonso, Cavite | STARLIGHTS TRAINING SCHOOL FOR SPECIAL YOUTH, INC. / 334 Tamsul Ave., Brgy. Bayan Luma II, Cavite | 90 calendar days | JUNE 2, 2013 |
Pampanga Office Improvement | San Fernando, Pampanga | COCA-COLA BOTTLERS PHILS, INC. / 27th Floor, Net Lima Building, 5th Avenue cor. 26th Street Bonifacio Global City, Taguig City | 30 CALENDAR DAYS | JUNE 24, 2013 |
KCD COMMERCIAL COMPLEX | Alaminos, Laguna | MR. & MRS. CELSO C. DIOKO / Blk. 18 Lot 2 & 4, Villa de Toledo, Brgy. Balibago, Santa Rosa City, Laguna | 180 DAYS | JULY 31, 2013 |
CCBP Canlubang Plant Line 7-8 Packaging & Warehouse Expansion | Canlubang, Laguna | COCA-COLA BOTTLERS PHILS, INC. / 27th Floor, Net Lima Building, 5th Avenue cor. 26th Street Bonifacio Global City, Taguig City | 180 calendar days | November 2014 |
Antipolo Office Improvement | Marcos Highway, Antipolo | Coca-Cola Bottlers Phils., Inc./27th Floor, Net Lima Building, 5th Avenue cor, 26th Street Bonifacio Global City, Taguig City | 30 calendar days | MAY 29, 2013 |
Project Name | Location | Client Name / Contact Number | Duration | Complete Date |
---|---|---|---|---|
Design & Construction: Development of DW#15 and Interconnection to PS#8 FUI | FUI. Phase 1B, Tanauan, Batangas | FPIP UTILITIES, INC. / Barangay Sta. Anastacia, Sto. Tomas, Batangas / (043) 405-6020 | 75 days | MAY 30, 2013 |
Extension of DMMC & Estela Mercado Medical Plaza | Poblacion III, J.P. Laurel Highway, Tanauan City, Batangas | Daniel O. Mercado Medical Center Poblacion III, J.P. Laurel Highway, Tanauan City, Batangas | 6 months | SEPTEMBER 18, 2013 |
MOP-Alum. Perforated Cladding Birdscreen | Brgy. Katipunan, Villanueva, Misamis Oriental | COCA COLA BOTTLERS PHILIPPINES / INC.4F Kings Court II Bldg. 2129, Chino Roces Avenue, Makati City / 02-688-5888 | 60 days | APRIL 2, 2013 |
MOP-Warehouse Siding & Framing | Brgy. Katipunan, Villanueva, Misamis Oriental | COCA COLA BOTTLERS PHILIPPINES, INC. / 4F Kings Court II Bldg. 2129, Chino Roces Avenue, Makati City / 02-688-5888 | 60 days | MARCH 12, 2013 |
San Nicolas de Tolentino Church | Brgy. Cupang, Muntinlupa City | SAN NICOLAS DE TOLENTINO CHURCH, Brgy. Cupang, Muntinlupa City | 60 calendar days | JULY 13, 2013 |
FPIP - Riprapping Works @ Lot 25 | First Philippine Industrial Park, Brgy. Santa Anastacia, Sto. Tomas, Batangas | FIRST PHILIPPINE INDUSTRIAL PARK / Barangay Sta. Anastacia, Sto. Tomas, Batangas / (043)405-6020 | 50 DAYS | COMPLETED |
Project Name | Location | Client Name / Contact Number | Duration | Complete Date |
---|---|---|---|---|
CCBP - Cagayan Green Field Project | Brgy. Katipunan, Villanueva, Misamis Oriental | COCA COLA BOTTLERS PHILIPPINES, INC. / 4F Kings Court II Bldg. 2129, Chino Roces Avenue, Makati City / 02-688-5888 | 180 days | OCTOBER 25, 2011 |
Proposed Warehouse CBC Davao Plant | Bago Aplaya, Davao City | COCA COLA BOTTLERS PHILIPPINES / INC.4F Kings Court II Bldg. 2129, Chino Roces Avenue, Makati City / 02-688-5888 | 120 days | MARCH 31, 2011 |
New CSD NRPET - Warehouse & Bottling Building | Canlubang, Calamba City, Laguna | COCA COLA BOTTLERS PHILIPPINES, INC. / 4F Kings Court II Bldg. 2129, Chino Roces Avenue, Makati City / 02-688-5888 | 120 days | JULY 30, 2011 |
CCBP-Cagayan Green Field Project Phase 2 | Brgy. Katipunan, Villanueva, Misamis Oriental | COCA COLA BOTTLERS PHILIPPINES, INC. / 4F Kings Court II Bldg. 2129, Chino Roces Avenue, Makati City / 02-688-5888 | 105 DAYS | OCTOBER 25, 2011 |
Cebu-Various Civil works Prop L3 Munster | Mandaue City, Cebu | COCA COLA BOTTLERS PHILIPPINES, INC. / 4F Kings Court II Bldg. 2129, Chino Roces Avenue, Makati City / 02-688-5888 | 150 days | COMPLETED |
Cagayan De Oro Greenfield Project - Construction of Misamis Oriental Plant Additional Works Phase 1 | Brgy. Katipunan, Villanueva, Misamis oriental | COCA COLA BOTTLERS PHILIPPINES, INC. / 4F Kings Court II Bldg. 2129, Chino Roces Avenue, Makati City / 02-688-5888 | 15 DAYS | SEPTEMBER 16, 2011 |
Construction of Power Utility Service Connection for Lot 30A, | FPIP. Phase 1B, Tanauan, Batangas | FIRST PHILIPPINE INDUSTRIAL PARK / Barangay Sta. Anastacia, Sto. Tomas, Batangas / (043)405-6020 | 45 DAYS | FEBRUARY 09, 2012 |
CCBP - Cebu Plant (Munster Line - Civil Works) | Mandaue City, Cebu | COCA-COLA BOTTLERS PHILS, INC. | 150 days | NOVEMBER 2011 |
Design & Construction: Development of DW#15 and Interconnection to PS#8 | FPIP, Brgy. Ulango, Tanauan City, Batangas | FPIP UTILITIES, INC. | 75 days | FEBRUARY 11, 2012 |
Design & Construction: Development of DW#15 and Interconnection to PS#8 | FPIP, Brgy. Ulango, Tanauan City, Batangas | FPIP UTILITIES, INC. | 75 days | FEBRUARY 11, 2012 |
Provision of Power Stub-out for Lot 30A | FPIP, Brgy. Ulango, Tanauan City, Batangas | FIRST PHILIPPINE INDUSTRIAL PARK | 30 days | FEBRUARY 11, 2012 |
Extension of DMMC & Estela Mercado Medical Plaza | Pres. Laurel Hi-way, Tanaun City, Batangas | DANIEL O. MERCADO MEDICAL CENTER | 6 months | COMPLETED |
Project Name | Location | Client Name / Contact Number | Duration | Complete Date |
---|---|---|---|---|
CCBP- MENDIOLA S.O. Proposed Renovation of New Offices | CCBP- Mendiola Plant, Mendiola Manila | COCA COLA BOTTLERS PHILIPPINES, INC. / 4F Kings Court II Bldg. 2129, Chino Roces Avenue, Makati City / 02-688-5888 | 30 DAYS | COMPLETED |
CCBP- Renovation of Red System Office | CCBP Santa Rosa Plant, Brgy. Pulong Santa Cruz, Santa Rosa City, Laguna | COCA COLA BOTTLERS PHILIPPINES, INC. / 4F Kings Court II Bldg. 2129, Chino Roces Avenue, Makati City / 02-688-5888 | 15 DAYS | COMPLETED |
FPIP - Slope Stabilization at Lot 22C. Ph 1B Riprap and soil Benching Works | First Philippine Industrial Park, Brgy. Santa Anastacia, Sto. Tomas, Batangas | FIRST PHILIPPINE INDUSTRIAL PARK / Barangay Sta. Anastacia, Sto. Tomas, Batangas / (043)405-6020 | 30DAYS | COMPLETED |
CCBP-SRP2 Various Additional Works - New Hotfill Line | CCBP Santa Rosa Plant, Brgy. Pulong Santa Cruz, Santa Rosa City, Laguna | COCA COLA BOTTLERS PHILIPPINES, INC. / 4F Kings Court II Bldg. 2129, Chino Roces Avenue, Makati City / 02-688-5888 | 45 days | COMPLETED |
CCBP-IMUS Plant Structural Wall Framing, Zocalo Wall | CCBP-Imus Plant, Imus Cavite | COCA COLA BOTTLERS PHILIPPINES, INC. / 4F Kings Court II Bldg. 2129, Chino Roces Avenue, Makati City / 02-688-5888 | 15 DAYS | COMPLETED |
CCBP- Meycauayan Plant Additional Concrete Pavement | CCBP-Meycauayan Plant, Meycauayan Bulacan | COCA COLA BOTTLERS PHILIPPINES, INC. / 4F Kings Court II Bldg. 2129, Chino Roces Avenue, Makati City / 02-688-5888 | 15 DAYS | COMPLETED |
FPIP - Water supply Improvement Project: Phase 2 (Pump Station 8,9 & 10 including Distribution Line, Access Road and Slope Protection) | FPIP, Phase 1B, Tanauan, Batangas | FPIP UTILITIES, INC. / Barangay Sta. Anastacia, Sto. Tomas, Batangas / (043) 405-6020 | 150 DAYS | COMPLETED |
First Philec Solar Corp. Phase 2 - Wiresaw Building 2 | Lot 19 Phase 1B FPIP, Brgy. Ulango, Tanauan City, Batangas | FIRST PHILEC SOLAR CORPORATION / Lot 19 Phase 1B, FPIP, Brgy. Ulango, Tanauan City, Batangas / (02)214-6700 | 105 DAYS | COMPLETED |
First Philec Solar Corp. Phase 2 - Multi-Purpose/Admin Bldg. | Lot 19 Phase 1B FPIP, Brgy. Ulango, Tanauan City, Batangas | FIRST PHILEC SOLAR CORPORATION / Lot 19 Phase 1B, FPIP, Brgy. Ulango, Tanauan City, Batangas / (02)214-6700 | 120 days | COMPLETED |
CCBPI- Cagayan Green Field Perimeter Fence | Brgy. Katipunan, Villanueva, Misamis oriental | COCA COLA BOTTLERS PHILIPPINES, INC. / 4F Kings Court II Bldg. 2129, Chino Roces Avenue, Makati City / 02-688-5888 | 90 days | COMPLETED |
CCBP-SRP1 Const Main Feeder Electrical Conduit | CCBP Santa Rosa Plant, Brgy. Pulong Santa Cruz, Santa Rosa City, Laguna | COCA COLA BOTTLERS PHILIPPINES, INC. / 4F Kings Court II Bldg. 2129, Chino Roces Avenue, Makati City / 02-688-5888 | COMPLETED |
Project Name | Location | Client Name / Contact Number | Duration | Complete Date |
---|---|---|---|---|
CCBPI CANLUBANG PLANT - DESIGN & CONSTRUCTION OF FACILITIES FOR WATERLINE PROJECT (PHASE 1) | CCBPI Canlubang Plant, Canlubang Laguna | COCA COLA BOTTLERS PHILIPPINES, INC. / 4F Kings Court II Bldg. 2129, Chino Roces Avenue, Makati City / 02-688-5888 | 180 DAYS | JULY 25, 2008 |
CCBPI CANLUBANG PLANT - CONSTRUCTION OF 2ND PHASE PAVEMENT EXTENSION | CCBPI Canlubang Plant, Canlubang Laguna | COCA COLA BOTTLERS PHILIPPINES, INC. / 4F Kings Court II Bldg. 2129, Chino Roces Avenue, Makati City / 02-688-5888 | 30 DAYS | FEBRUARY 3, 2009 |
CCBPI CANLUBANG PLANT - CONSTRUCTION OF PROCESS AREA BUILDING FOR LINE 4 | CCBPI Canlubang Plant, Canlubang Laguna | COCA COLA BOTTLERS PHILIPPINES, INC. / 4F Kings Court II Bldg. 2129, Chino Roces Avenue, Makati City / 02-688-5888 | 30 DAYS | APRIL 18, 2009 |
CONSTRUCTION OF POLICE & FIRE HEADQUARTERS PHASE 1 | Alabang, Muntinlupa City | CITY OF MUNTINLUPA / 02-861-1127 | 120 DAYS | MARCH 14, 2009 |
CONSTRUCTION OF POLICE & FIRE HEADQUARTERS PHASE 2 | Alabang, Muntinlupa City | CITY OF MUNTINLUPA / 02-861-1127 | 90 DAYS | APRIL 17, 2009 |
CONSTRUCTION OF POLICE & FIRE HEADQUARTERS PHASE 3 | Alabang, Muntinlupa City | CITY OF MUNTINLUPA / 02-861-1127 | 90 DAYS | MARCH 02, 2009 |
SITE DEVELOPMENT WORKS AVIDA TOWERS SAN LAZARO | San Lazaro, Sta. Cruz, Manila | AVIDA LAND CORP / 7th Floor Mondragon House 324 Sen Gil Puyat Avenue, Makati City / 02-7531460 | 180 DAYS | MARCH 31, 2009 |
CCBPI CANLUBANG PLANT - CONSTRUCTION OF WAREHOUSE BUILDING #5 | CCBPI Canlubang Plant, Canlubang Laguna | COCA COLA BOTTLERS PHILIPPINES, INC. / 4F Kings Court II Bldg. 2129, Chino Roces Avenue, Makati City / 02-688-5888 | 60 DAYS | APRIL 17, 2009 |
CCBPI MEYCAUAYAN PLANT - CONSTRUCTION OF WAREHOUSE EXPANSION | CCBPI- Meycauayan Plant, Bulacan | COCA COLA BOTTLERS PHILIPPINES, INC. / 4F Kings Court II Bldg. 2129, Chino Roces Avenue, Makati City / 02-688-5888 | 100 DAYS | JUNE 02, 2009 |
CCBPI MEYCAUAYAN PLANT - LOADING/UNLOADING DEPAL | CCBPI- Meycauayan Plant, Bulacan | COCA COLA BOTTLERS PHILIPPINES, INC. / 4F Kings Court II Bldg. 2129, Chino Roces Avenue, Makati City / 02-688-5888 | days | JUNE 11, 2009 |
LAND DEVELOPMENT WORKS RIEGO DE DIOS VILLAGE | Brgy. Paradahan Tanza Cavite | AVIDA LAND CORP / 7th Floor Mondragon House 324 Sen Gil Puyat Avenue, Makati City / 02-7531460 | 90 DAYS | DECEMBER 9, 2009 |
CCBPI-SRP SLTM Necessary for the Construction of Loading / unloading area near the depalletizing /palletizing Area | CCBP Santa Rosa Plant, Brgy. Pulong Santa Cruz, Santa Rosa City, Laguna | COCA COLA BOTTLERS PHILIPPINES, INC. / 4F Kings Court II Bldg. 2129, Chino Roces Avenue, Makati City / 02-688-5888 | 30 DAYS | DECEMBER 11, 2009 |
Project Name | Location | Client Name / Contact Number | Duration | Complete Date |
---|---|---|---|---|
CONSTRUCTION OF COVERED COURT | Country Homes II Putatan Muntinlupa City | CITY OF MUNTINLUPA / 02-861-1127 | 100 DAYS | MARCH 14,2009 |
CCBPI SANTA ROSA PLANT, - CONSTRUCTION OF VARIOUS CONCRETE PAVEMENT, GUARDHOUSE, GATE & FENCE | CCBP Santa Rosa Plant, Brgy. Pulong Santa Cruz, Santa Rosa City, Laguna | COCA COLA BOTTLERS PHILIPPINES, INC. / 4F Kings Court II Bldg. 2129, Chino Roces Avenue, Makati City / 02-688-5888 | 45 DAYS | DECEMBER 11, 2009 |
CCBPI SANTA ROSA PLANT 1 - REHAB. OF CONCRETE PAVEMENT | CCBP Santa Rosa Plant, Brgy. Pulong Santa Cruz, Santa Rosa City, Laguna | COCA COLA BOTTLERS PHILIPPINES, INC. / 4F Kings Court II Bldg. 2129, Chino Roces Avenue, Makati City / 02-688-5888 | days | NOVEMBER 4, 2009 |
Project Name | Location | Client Name / Contact Number | Duration | Complete Date |
---|---|---|---|---|
CONSTRUCTION OF REMAINING ROAD LOT 3 & 7 EXTENSION, NEW ROAD & UTILITIES | Brgy. Ulango, Tanauan City, Batangas | FIRST PHILIPPINE INDUSTRIAL PARK / Brgy. Sta. Anastacia, Sto. Tomas, Batangas / 043-4056020 | 150 DAYS | JULY 6, 2009 |
CCBPI - LITTLE RED SCHOOL | Quezon City | COCA COLA BOTTLERS PHILIPPINES, INC. / 4F Kings Court II Bldg. 2129, Chino Roces Avenue, Makati City / 02-688-5888 | 60 DAYS | JULY 31, 2008 |
CCBPI STA. ROSA PLANT 1 - EXTENSION OF SYRUP ROOM | CCBPI St. Rosa Plant 1, Sta. Rosa City, Laguna | COCA COLA BOTTLERS PHILIPPINES, INC. / 4F Kings Court II Bldg. 2129, Chino Roces Avenue, Makati City / 02-688-5888 | 30 DAYS | JUNE 16, 2008 |
CCBPI STA. ROSA PLANT 2 - CONSTRUCTION OF HOTFILL & THAWING/CRUSER AREA | CCBPI St. Rosa Plant 2, Sta. Rosa City, Laguna | COCA COLA BOTTLERS PHILIPPINES, INC. / 4F Kings Court II Bldg. 2129, Chino Roces Avenue, Makati City / 02-688-5888 | 30 DAYS | JUNE 18, 2008 |
CCBPI STA. ROSA PLANT 2 - CONSTRUCTION OF INJECTION MACHINE AREA (BLOWMOLDING) | CCBPI St. Rosa Plant 2, Sta. Rosa City, Laguna | COCA COLA BOTTLERS PHILIPPINES, INC. / 4F Kings Court II Bldg. 2129, Chino Roces Avenue, Makati City / 02-688-5888 | 30DAYS | JUNE 16, 2008 |
CCBPI CANLUBANG PLANT - REHABILITATION OF TERRITORY & REGION DIRECTOR'S (PHASE 2) | CCBPI Canlubang Plant, Canlubang Laguna | COCA COLA BOTTLERS PHILIPPINES, INC. / 4F Kings Court II Bldg. 2129, Chino Roces Avenue, Makati City / 02-688-5888 | 45 DAYS | MARCH 5, 2008 |
CCBPI CANLUBANG PLANT - CONSTRUCTION OF BOTTLING AREA BUILDING & 15 METERS ACCESS PAVEMENT FOR LINE 5 | CCBPI Canlubang Plant, Canlubang Laguna | COCA COLA BOTTLERS PHILIPPINES, INC. / 4F Kings Court II Bldg. 2129, Chino Roces Avenue, Makati City / 02-688-5888 | 150 DAYS | APRIL 8, 2009 |
Project Name | Location | Client Name / Contact Number | Duration | Complete Date |
---|---|---|---|---|
PROPOSED 220 BED HOSPITAL | Maharlika Highway, Poblacion 2, Sto. Tomas, Batangas | ST. FRANCES CABRINI MEDICAL CENTER / Maharlika Highway, Poblacion 2, Sto. Tomas, Batangas / 043-7784811 | 300 DAYS | DECEMBER 2007 |
THREE (3) STOREY COMMERCIAL BUILDING | Brgy. Niugan, Cabuyao, laguna | FORAB DEVELOPMENT CORPORATION / Cabuyao, Laguna / 049-5022880 | 150 days | NOVEMBER 2007 |
PROPOSED SERVITEK AUTO PARTS BUILDING WITH OFFICE | Brgy. Niugan, Cabuyao, laguna | FORAB DEVELOPMENT CORPORATION / Cabuyao, Laguna / 049-5022880 | 30 DAYS | SEPTEMBER 2007 |
LAND DEVELOPMENT WORK PHASE 1 INCLUDING ADDITIONAL WORKS | Yakal & Malugay St., San Antonio, Makati City | AVIDA LAND CORP / 7th Floor Mondragon House 324 Sen Gil Puyat Avenue, Makati City / 02-7531460 | 45 DAYS | NOVEMBER 27, 2008 |
CONSTRUCTION OF 30M SPAN BRIDGE INCLUDING ADDITIONAL WORKS | Bacoor, Cavite | AVIDA LAND CORP / 7th Floor Mondragon House 324 Sen Gil Puyat Avenue, Makati City / 02-7531460 | 120 DAYS | MAY 20, 2008 |
REPAIR, WATERPROOFING, RE-PAINTING OF YTMI ROOFING | Brgy. Makiling, Calamba City | YAZAKI-TORRES MANUFACTURING INC. / YTMI Realty Economic Zone, Brgy. Makiling, Calamba City / 049-5021592 | 30 DAYS | JUNE 29, 2007 |
CCBPI OTIS PLANT- INTERIOR WORKS AT OTIS OFFICE RENOVATION INCLUDING ADDITIONAL WORKS | Paz Guanzon St. (OTIS), Pandacan City of Manila | COCA COLA BOTTLERS PHILIPPINES, INC. / 4F Kings Court II Bldg. 2129, Chino Roces Avenue, Makati City / 02-688-5888 | 30 DAYS | NOVEMBER 2007 |
PROPOSED 220 BED HOSPITAL (Package 2) - Plumbing & Civil Works | Maharlika Highway, Poblacion 2, Sto. Tomas, Batangas | ST. FRANCES CABRINI MEDICAL CENTER / Maharlika Highway, Poblacion 2, Sto. Tomas, Batangas / 043-7784811 | 270 DAYS | APRIL 16, 2009 |
CCBPI CEBU PLANT- CONSTRUCTION OF RAW WATER CISTERN TANK | CCBPI- Cebu Plant | COCA COLA BOTTLERS PHILIPPINES, INC. / 4F Kings Court II Bldg. 2129, Chino Roces Avenue, Makati City / 02-688-5888 | 90 DAYS | DECEMBER 2007 |
CCBPI CEBU PLANT - CONSTRUCTION OF TRANSFORMER PLATFORM | CCBPI- Cebu Plant | COCA COLA BOTTLERS PHILIPPINES, INC. / 4F Kings Court II Bldg. 2129, Chino Roces Avenue, Makati City / 02-688-5888 | 60 DAYS | DECEMBER 2007 |
ROADWAY IMPROVEMENT | Bayanan Muntinlupa City | CITY OF MUNTINLUPA / 02-861-1127 | 60 DAYS | DECEMBER 2007 |
STREET LIGHTING | Bayanan Muntinlupa City | CITY OF MUNTINLUPA / 02-861-1127 | 30 DAYS | DECEMBER 2007 |
(PALM SPRING) LAND DEVELOPMENT WORKS | Trece Martirez, Cavite | CITYLAND, INC. / Cityland Condominium 10 Tower 1, 156 Ayala North, Makati City / 02-8923571 | 180 DAYS | JUNE 6, 2008 |
DESIGNING OF SLOPE GRADE ELEVATION & SITE GRADING OF LOT 22 TO 24 & ROAD LOT 3 EXT. R.O.W. | FIRST PHILIPPINE INDUSTRIAL PARK / Brgy. Sta. Anastacia, Sto. Tomas, Batangas / 043-4056020 | FPIP Brgy. Tanauan, Batangas City | 60 DAYS | APRIL 28, 2008 |
CCBPI STA. ROSA PLANT - CONSTRUCTION OF BOTTLE WASHER & PASTEURIZER FOUNDATION & FILLING ROOM | CCBPI - Sta. Rosa Plant 1, Sta. Rosa City, Laguna | COCA COLA BOTTLERS PHILIPPINES, INC. / 4F Kings Court II Bldg. 2129, Chino Roces Avenue, Makati City / 02-688-5888 | 60 DAYS | JAN. 12, 2008 |
GARDEN CITY IV & CORINTHIAN HOMES (ADDITIONAL WORKS) | Brgy. Macabling, Sta. Rosa City, Laguna | CORINTHIAN / SUNVAR / T-12 Sunvar Plaza Building, Pasay Road corner Amorsolo St., Makati City / 02-8178211 | COMPLETED |
Project Name | Location | Client Name / Contact Number | Duration | Complete Date |
---|---|---|---|---|
DMMC - HEALTH SCIENCES INSTITUTE INCLUDING ADDITIONAL WORKS | Tanauan City Batangas | DMMC INSTITUTE OF HEALTH SCIENCES / 143 Narra St., Mountview subdivision, Brgy. 3, Tanauan / 043-7786893 | 240 days | MAY 29, 2007 |
WINNER BADMINTON COURT | Villa Segovia, San Lorenzo South, Dita, Santa Rosa City, Laguna | MR. & MRS. CELSO C. DIOKO | 120 DAYS | OCTOBER 2006 |
(HPI NEW FACTORY) - External Paving Works | FPIP, Brgy. Ulango, Tanauan City, Batangas | KAJIMA PHILIPPINES INCORPORATED / 02-886-6818 | 60 DAYS | APRIL 2006 |
(IPI 2ND FACTORY) - Temporary works, stripping, stockpiling, loading & disposal of unsuitable top soil, sidewalk Shed between Canteen & Employees Entrance, Entry & Exit Driveway Access & Guardhouse, Concrete Cutting, Casting Bed for Pre-cast beams &... | FPIP, Barangay Sta.Anastacia, Sto. Tomas, Batangas | KAJIMA PHILIPPINES INCORPORATED / 02-886-6818 | 60 DAYS | MAY 2006 |
Proposed Warehouse Renovation Works | EPZA, Rosario, Cavite | M.A. TECHNOLOGY, INC. / SFB #11 Phase 3 PEZA Rosario Cavite / 046-4372020 | 120 DAYS | MAY 2006 |
KPI - IPI 2ND FACTORY - EXTERNAL WORKS (PAVEMENT & DRAINAGE SYSTEM) | FPIP, Barangay Sta.Anastacia, Sto. Tomas, Batangas | KAJIMA PHILIPPINES INCORPORATED / 02-886-6818 | 90 DAYS | COMPLETED |
PROPOSED CONSTRUCTION OF MODEL HOUSE | TCH2B Brgy. Neogan, Tagaytay City | CITYLAND, INC. / Cityland Condominium 10 Tower 1, 156 Ayala North, Makati City / 02-8923571 | 120 DAYS | COMPLETED |
GARDEN CITY IV & CORINTHIAN HOMES | Brgy. Macabling, Sta. Rosa City, Laguna | CORINTHIAN / SUNVAR / T-12 Sunvar Plaza Building, Pasay Road corner Amorsolo St., Makati City / 02-8178211 | 120 DAYS | COMPLETED |
PROPOSED STANDARD 4-STOREY 12-CLASSROOM SCHOOL BLDG. WITH OVERHEAD TANK | Brgy. Market Area, City of Sta. Rosa, Laguna | CITY OF STA. ROSA / 049-5267910 | 120 DAYS | COMPLETED |
VARIOUS MODIFICATION WORKS | 119 Technology Avenue, Special Economic Zone Laguna Technopark, Binan, Laguna | SUNNELIT PHILIPPINES CORPORATION / 119 Technology Avenue, Special Economic Zone, Laguna Technopark, Binan, Laguna / 049-5412576 | 60 DAYS | COMPLETED |
PATRICIA YOLANDA VILLAGE LAND DEVELOPMENT WORKS INCLUDING ADDITIONAL WORKS | Brgy. Asis 1, Mendez, Cavite | DIOSDADO HOLGADO | 180 days | MARCH 16,2007 |
PROPOSED SECOND FLOOR OFFICE & VARIOUS RENOVATION WORKS | SFB No. 11 Phase 3(Building 1) PEZA, Rosario, Cavite | M.A. TECHNOLOGY, INC. / SFB #11 Phase 3 PEZA Rosario Cavite / 046-4372020 | 45 DAYS | COMPLETED |
VARIOUS ADDITIONAL WORKS INCLUDING LANDSCAPING WORKS, BASKETBALL COURT, ELECTRICAL WORKS | SFB No. 11 Phase 3(Building 1) PEZA, Rosario, Cavite | M.A. TECHNOLOGY, INC. / SFB #11 Phase 3 PEZA Rosario Cavite / 046-4372020 | 45 DAYS | COMPLETED |
LAND DEVELOPMENT WORKS OF TAGAYTAY COUNTRY HOMES 2C | Brgy. Zambal, Tagaytay City | CITYLAND, INC. / Cityland Condominium 10 Tower 1, 156 Ayala North, Makati City / 02-8923571 | NOVEMBER 5, 2007 |
Project Name | Location | Client Name / Contact Number | Duration | Complete Date |
---|---|---|---|---|
FPIP- Site Grading of Lot 29, 30, 31, 32, 33 & Road R.O.W. of Road Lot 8, Phase 1B | FPIP Compound, Brgy. Ulango, Tanauan City, Batangas | FIRST PHILIPPINE INDUSTRIAL PARK / Brgy. Sta. Anastacia, Sto. Tomas, Batangas / 043-4056020 | 90 days | AUGUST 5, 2005 |
SITE GRADING WORKS OF THE PROPOSED HONDA PHIL., INC. NEW FACTORY | FPIP Compound, Brgy. Ulango, Tanauan City, Batangas | HONDA PHILIPPINES INC./ 02-886-6818 | 60 days | AUGUST 5, 2005 |
FPIP-Food Park Extension | FPIP Barangay Sta. Anastacia, Sto. Tomas Batangas | FIRST PHILIPPINE INDUSTRIAL PARK / Brgy. Sta. Anastacia, Sto. Tomas, Batangas / 043-4056020 | 60 DAYS | DECEMBER 2005 |
Proposed Two (2) Storey Residential Building | Block 16, Lot 11, Stonecrest Subd., San Pedro, Laguna | MR. & MRS. TOMAS ROSAL | 150 DAYS | JANUARY 2006 |
Proposed Diesel Fuel System For North A Pump | La Mesa Dam, Novaliches, Quezon City | MAYNILAD WATER SERVICES, INC. / MWSS Compound, Katipunan Road, Balana, Quezon City / 02-4353368 | 75 days | DECEMBER 2005 |
HPI NEW FACTORY - LAND DEVELOPMENT WORKS | FPIP, Brgy. Ulango, Tanauan City, Batangas | KAJIMA PHILIPPINES INCORPORATED / 02-886-6818 | 60 days | APRIL 6, 2005 |
PROPOSED THREE(3) STOREY SCHOOL BUILDING | Villa Segovia, San Lorenzo South, Sta. Rosa City, Laguna | MS.ADELA J. LUAT | 120 days | MARCH 5, 2005 |
Project Name | Location | Client Name / Contact Number | Duration | Complete Date |
---|---|---|---|---|
Nissin Precision Phils., Inc. Two (2) Storey Office/Factory and Warehouse Building/Machine Foundation | Lot 15-l, FPIP, Special Economic Zone Brgy. Sta. Anastacia, Sto. Tomas, Batangas | Nissin Precision Phils., Inc. | 120 days | JULY 31, 2004 |
PROPOSED LEASABLE BUILDING @ LOT 15-E(MODEL F) ATTENDANT SITE DEVELOPMENT WORKS & UTILITIES | First Philippine Industrial Park Sto. Tomas, Batangas | FPIP PROPERTY DEVELOPERS & MANAGEMENT CORP. | 150 days | SEPTEMBER 30, 2004 |
ROOFING WORKS @ WASHING MACHINE WAREHOUSE AREA FLAT FORM / ADDITIONAL GUTTER | KM 23 West Service Road, Brgy. Cupang, Muntinlupa City | SHARP PHILS. CORP. | 30 days | JUNE 30, 2004 |
SITE GRADING @ LOT 34 (20 HAS) | FPIP Brgy. Sta. Anstacia Sto. Tomas, Batangas | FIRST PHILIPPINE INDUSTRIAL PARK | 90 days | FEBRUARY 2005 |
LAND DEVELOPMENT WORKS | Tagaytay Country Homes 2B, Brgy. Neogan, Tagaytay City | CITYLAND, INC. | 270 days | COMPLETED |
GUARDHOUSE EXTENSION, NEW GATE & ADDITIONAL CONCRETE PAVEMENT | Lipa Plant Lipa Batangas | EPSON PRECISICON (PHILIPPINES), INC. | 60 days | OCTOBER 16, 2004 |
PROPOSED LEASABLE BUILDING @ LOT 15-E(MODEL F) ATTENDANT SITE DEVELOPMENT WORKS & UTILITIES - INTERCONNECTION | FPIP Barangay Sta. Anastacia, Sto. Tomas Batangas | FPIP PROPERTY DEVELOPERS & MANAGEMENT CORP. | 45 days | OCTOBER 30, 2004 |
TWO (2) STOREY FACTORY EXTENSION | LIMA Technology Center, Lipa City, Batangas | SOHBI KOHGEI (PHILIPPINES), INC. | 105 days | MARCH 2005 |
Project Name | Location | Client Name / Contact Number | Duration | Complete Date |
---|---|---|---|---|
Development of Open Space | Ph III Bo. Putatan, Muntinlupa City | 60 days | MARCH 3, 2003 | |
Renovation of Zamboanga Branch Building | Camp Navarro, Lower Calarian, Zamboanga City | 130 days | JUNE 2003 | |
PAGSANJAN COMMERCIAL COMPLEX (Site Development works) | Brgy.Binan, Pagsanjan, Laguna | 150 days | OCTOBER 2003 | |
Proposed Warehouse Extension | LIMA Technology Center, SEZ, Lipa City | 90 days | MAY 8, 2003 | |
Earthworks & Const. of Septic Tank | Katipunan road, Quezon City | 67 days | JULY 15, 2003 | |
Const. of Perimeter Fence @ Lot 15-F & G | FPIP Park. Sto. Tomas, Batangas | 60 days | OCTOBER 2003 | |
Const. of Perimeter Fence @ Lot 15-F & G | FPIP Park. Sto. Tomas, Batangas | 60 days | OCTOBER 2003 | |
Const. of Erosion Protection | FPIP Park. Sto. Tomas, Batangas | 60 days | JULY 10, 2003 | |
Const. of Six(6) Model Houses | Zarraga, Iloilo | 60 days | NOVEMBER 2003 | |
Const. of Two(2) Storey Residence Building | Town & Country Subd., Brg. Banay-Banay, Cabuyao | DECEMBER 15, 2003 | ||
Const. of Two(2) Storey Residence Building | Sapang Palay, San Jose Del Monte, Bulacan | 135 days | APRIL 10, 2004 |
Project Name | Location | Client Name / Contact Number | Duration | Complete Date |
---|---|---|---|---|
Land Development Works-JUBILATION New Binan QUADRANT 3 | San Antonio, Binan, Laguna | 70 days | JUNE 2002 | |
Three(3) Storey School Building | Sta.Rosa,Laguna | 90 days | MAY 2002 | |
Bagong Sta. Rosa Village II-Housing | Tagapo, Sta. Rosa, Laguna | 360 days | Completed | |
Two (2) Storey 2 - Unit Residential Building | Fort Bonifacio, Taguig | 110 days | JULY 2002 | |
Two (2) Storey Residential Building Extension w/ Swimming Pool | Villa de Toledo, SLS, Sta. Rosa, Laguna | 100 days | AUGUST 2002 | |
Innotech Building | Sta.Rosa,Laguna | 90 days | SEPTEMBER 2002 | |
Brgy. Hall-Sinalhan | Brgy. Sinalhan, Sta. Rosa, Laguna | 90 days | SEPTEMBER 2002 | |
Add'l Earthfilling works and Correction of Side Slope | Brgy. Inagdangan, Zarraga, Iloilo City | 100 days | MARCH 1, 2003 | |
Two (2) Storey 1- Unit Residential Building | Fort Bonifacio, Taguig | 55 days | NOVEMBER 2002 | |
4th Floor Expansion of Y-building | Pres. Laurel Hi-way, Tanaun City, Batangas | 150 days | MAY 24, 2003 |
Project Name | Location | Client Name / Contact Number | Duration | Complete Date |
---|---|---|---|---|
Heat Treatment Plant-labor only | Laguna Technopark,Binan,Laguna | 60 days | JUNE 2001 | |
Masonry & Plastering Works | Laguna Technopark,Binan,Laguna | 30 days | MAY 2001 | |
Land Development Works for Mutual Homes Zarraga | Brgy. Inagdangan, Iloilo City | 180 days | AUGUST 2001 | |
Const. of Cistem Tank and Pumphouse-Riviera Sports & Country Club | Silang, Cavite | 90 days | MAY 2001 | |
Proposed Office Extension | San Pedro, Laguna | 30 days | JUNE 2001 | |
Proposed Const. of Park & Children's Playground | Camarin,Caloocan City | 60 days | JUNE 2001 | |
Rehab. of PHILPHOS CONVEYOR MACHINE | Bonifacio St.,Ormoc City | 45 days | OCTOBER 2001 | |
Land Development Works-Drainage System/Waterline System/Road Concreting-Villagio Ignatius | Gen. Trias Cavite | 120 days | MAY 2002 | |
Two(2) Storey Residential Bldg. | MeadoWood Bacoor, Cavite | 60 days | NOVEMBER 7, 2001 | |
Land Development Works-JUBILATION New Binan | San Antonio, Binan, Laguna | 90 days | JANUARY 2002 | |
Two Storey Residence | Macaria Village, Pacita San Pedro, Laguna | 120 days | JANUARY 2002 | |
Correction of Punchlisted Deficiencies for Package "A" of the Riviera Residential Subdivision Area | Silang, Cavite | 120 days | APRIL 2, 2002 | |
Bagong Sta.Rosa, Village II | Brgy. Tagapo, Sta.Rosa, Laguna | 180 days (Phase 1) | Completed | |
Completion of New Warehouse of Digos Sales Office | Davao City | 120 days | DECEMBER 22, 2000 |
Project Name | Location | Client Name / Contact Number | Duration | Complete Date |
---|---|---|---|---|
31 Housing Units @ Ph. 1-E | San Lorenzo South,Sta.Rosa,Laguna | 90 days | FEBRUARY 1999 | |
Construction of concrete pavement | San Lorenzo South,Sta.Rosa,Laguna | 45 days | JANUARY 1999 | |
ULAS,DAVAO PLANT Sales Office | Ulas, Davao City | 90 days | JANUARY 1999 | |
SRPlant Concrete Pavement Rehab at gate | Sta.Rosa,Laguna | 90 days | FEBRUARY 1999 | |
Muntinlupa Sales Office,concrete pavement and guard house Bldg. | RMT Compound Muntinlupa City | 45 days | FEBRUARY 1999 | |
CANLUBANG PLANT Concrete pavement and Warehouse Bldg. | Canlubang,Calamba Laguna | 120 days | APRIL 1999 | |
ILOCOS PLANT Open Shed Extension, PD Office and sugar Bodega | San Nicolas, ILocos Norte | 90 days | AUGUST 1999 | |
2-Storey Residence | Brgy.Bigaa,Cabuyao,Laguna | 60 days | APRIL 1999 | |
HOUSING PROJECT(2-Storey Residential) | San Joaquin,Pasig City | 60 days | AUGUST 1999 | |
2-Storey Residence | San Lorenzo South,Sta.Rosa,Laguna | 60 days | JUNE 1999 | |
Covered Court/Concrete pavement & covered pathway | Villa Olympia,Brgy.Pook,Sta.Rosa,Laguna | 90 days | JUNE 1999 | |
FORD MOTOR ASSEMBLY PLANT(Chain Link Fence) | Auto Park Sta.Rosa,Laguna | 60 days | AUGUST 1999 | |
SAN LORENZO HOUSING UNITS(Pilferable Works) | San Lorenzo South,Sta.Rosa,Laguna | 30 days | JULY 1999 | |
SAN LORENZO HOUSING UNITS(Repair Works) | San Lorenzo South,Sta.Rosa,Laguna | 90 days | JULY 1999 | |
CCBPI CAGAYAN DE ORO PLANT Warehouse Extension | Cagayan De Oro | 30 days | SEPTEMBER 1999 | |
CCBPI DAVAO PLANT Concrete Pavement & Warehouse Extension | Bajada Davao City | 150 days | DECEMBER 1999 |
Project Name | Location | Client Name / Contact Number | Duration | Complete Date |
---|---|---|---|---|
Const. Of 2-storey residential | San Lorenzo South,Sta.Rosa,Laguna | 90 days | FEBRUARY 1999 | |
THIRTY THREE(33) Housing Units @Ph 1-E | San Lorenzo South,Sta.Rosa,Laguna | 60 days | FEBRUARY 1998 | |
CM-TDK Landscaping | Laguna Technopark | 60 days | FEBRUARY 1998 | |
TACLOBAN PLANT Warehouse Extension | Fatima Vill.,Tacloban City | 120 days | FEBRUARY 1998 | |
NAGA PLANT Replacement of trusses and roofing sheets | Naga City | 90 days | FEBRUARY 1998 | |
ULAS DAVAO Warehouse Building | Ulas, Davao City | 120 days | APRIL 1998 | |
TAYTAY PLANT Warehouse Building,Sales Office Bldg.,Guardhouse and Genset Bldg. | Muzon Nati'l. Hi-way Taytay Rizal | 120 days | AUGUST 1998 | |
TAYTAY PLANT Site Development and Perimeter Fence | Muzon Nati'l. Hi-way Taytay Rizal | 120 days | JULY 1998 | |
TAYTAY PLANT Deepwell Drilling | Muzon Nati'l. Hi-way Taytay Rizal | 120 days | SEPTEMBER 1998 | |
TAYTAY PLANT Additional electrical works Deepwell Drilling | Muzon Nati'l. Hi-way Taytay Rizal | 60 days | AUGUST 1998 | |
Installation of pilferable materials-12 units | San Lorenzo South,Sta.Rosa,Laguna | 45 days | MARCH 1998 |
Project Name | Location | Client Name / Contact Number | Duration | Complete Date |
---|---|---|---|---|
Construction of Perimeter Fence | Cabuyao | 60 days | FEBRUARY 1997 | |
Construction of Perimeter Fence | Phase 1-C San Lorenzo South,Sta.Rosa, Laguna | 60 days | JANUARY 1997 | |
Road Widening & Concrete Pavement | Pulo Diezmo,Cabuyao | 150 days | MARCH 1997 | |
CM-TDK Site Development | Laguna Technopark,Binan,Laguna | 90 days | APRIL 1997 | |
CM-TDK Temporary Facilities | Laguna Technopark,Binan,Laguna | 45 days | MAY 1997 | |
CM-TDK Roads,pavement,curbs & gutters & drainage system | Laguna Technopark,Binan,Laguna | 90 days | JUNE 1997 | |
COCA-COLA BOTTLERS PHILS.(Riprapping works at Bacolod Plant) | Bacolod City | 120 days | AUGUST 1997 | |
CM-TDK Common Access Road/Factory Bldg.Girbd,Floor Prep/reinforced | Laguna Technopark,Binan,Laguna | 60 days | SEPTEMBER 1997 | |
CM-TDK Common Access Road/Factory Bldg.Girbd,Floor Prep/reinforced | Laguna Technopark,Binan,Laguna | 60 days | SEPTEMBER 1997 | |
CM-TDK Canteen Building | Laguna Technopark,Binan,Laguna | 90 days | MAY 1997 | |
CM-TDK GUARDHOUSE BLDG.,HAZARDOUS BLDG.,Storm Drainage System and CHB Masorey Wall at Main Building | Laguna Technopark,Binan,Laguna | 90 days | SEPTEMBER 1997 | |
CM-TDK Main Building Parapet Wall,Stiffenes Column and Lintel | Laguna Technopark,Binan,Laguna | 90 days | SEPTEMBER 1997 | |
Additional Retaining Wall | Phase 1-C San Lorenzo South,Sta.Rosa, Laguna | 60 days | DECEMBER 1997 | |
Riprapping | San Lorenzo South,Sta.Rosa,Laguna | 60 days | NOVEMBER 1997 | |
SEVENTY NINE(79) HOUSING Units | San Lorenzo South,Sta.Rosa,Laguna | 90 days | APRIL 1997 | |
SEVENTY NINE(79) HOUSING Units | San Lorenzo South,Sta.Rosa,Laguna | 90 days | APRIL 1997 | |
FIFTY ONE(51) HOUSING Units | San Lorenzo South,Sta.Rosa,Laguna | 90 days | SEPTEMBER 1997 | |
SEVENTY EIGHT(78) Housing Units | Panorama Ville,Sta.Rosa,Laguna | 90 days | NOVEMBER 1997 | |
Land Development | ph 1D San Lorenzo South,Sta.Rosa,Laguna | 90 days | AUGUST 1997 | |
Retaining Wall & Tapping 12 m Outfall | Ph 1C San Lorenzo South,Sta.Rosa,Laguna | 60 days | JULY 1997 | |
Inst. Of Pilferable Materials | Ph 1C San Lorenzo South,Sta.Rosa,Laguna | 60 days | SEPTEMBER 1997 |
Project Name | Location | Client Name / Contact Number | Duration | Complete Date |
---|---|---|---|---|
COMMERCIAL BUILDING(Piling Foundation) | Zapote,Las Piñas | 90 days | MARCH 16, 1996 | |
Three(3) Bedroom bungalow | Landmark Subdivision,Calamba | CRISTINE DEE | 90 days | JUNE 22, 1996 |
CCBPI MUNTINLUPA Sales Office | RMT Compound,Muntinlupa,Metro Manila | 120 days | JUNE 4, 1996 | |
SIXTEEN(16) UNITS HOUSING | San Lorenzo South,Phase 1C | 45 days | APRIL 1996 | |
Spinning Mills | Calamba,Laguna | 180 days | JULY 2, 1996 | |
Tractor Bridge | Southwoods,Carmona | 90 days | JULY 12, 1996 | |
Tractor Bridge | Trece Martinez,Cavite | 100 days | SEPTEMBER 1996 | |
CCBPI SRPlant 2 Materials, Workshop & Facilities | Sta.Rosa Plant II | 200 days | DECEMBER 4, 1996 | |
CCBPI SRPlant 2 Boiler House | Sta.Rosa Plant II | 150 days | DECEMBER 4, 1996 | |
CCBPI SRPlant 2 External Tanks | Sta.Rosa Plant II | 120 days | DECEMBER 4, 1996 | |
CCBPI SRPlant 2 Sports Facilities | Sta.Rosa Plant II | 90 days | DECEMBER 20, 1996 | |
CCBPI ZAMBOANGA PLANT-Drainage System | Zamboanga Plant | 100 days | DECEMBER 20, 1996 | |
60 UNITS HOUSING | Dita,Sta.Rosa,Laguna | 45 days | DECEMBER 1996 |
Project Name | Location | Client Name / Contact Number | Duration | Complete Date |
---|---|---|---|---|
FIFTEEN(15) UNITS HOUSING | San Lorenzo South,Sta.Rosa,Laguna | 45 days | FEBRUARY 1995 | |
TEMPORARY FENCE | Theme Park San Lorenzo South,Sta.Rosa,Laguna | 90 days | JULY 30, 1995 | |
FORTY(40) HOUSING UNITS(Labor only) | Ayala,Biñan,Laguna | 90 days | JULY 30, 1995 | |
CCBPI NAGA PLANT Warehouse & Salesoffice | Naga City | 180 days | AUGUST 6, 1995 | |
CCBPI DASMA PLANT PAVEMENT-Drainage System | Dasmariñas,Cavite | 150 days | SEPTEMBER 06, 1995 | |
LPG-Refilling Plant | Batangas | 230 days | NOVEMBER 1995 | |
CCBPI DASMARINAS Sales Office | Dasmariñas,Cavite | 220 days | NOVEMBER 17, 1995 | |
CCBPI DASMARINAS Warehouse | Dasmariñas,Cavite | 280 days | NOVEMBER 20, 1995 | |
CCBPI GUMACA Sales Office & Pavement | Gumaca,Quezon | 90 days | DECEMBER 5, 1995 | |
SHOW ROOM | Rosario,Cavite | 210 days | DECEMBER 10, 1995 | |
CCBPI TANZA PLANT Deepwell Drilling | Tanza,Cavite | 60 days | DECEMBER 13, 1995 | |
CCBPI DASMA PLANT Guardhouse & Canteen | Dasmariñas,Cavite | Coca-Cola Bottlers Phils., Inc. | 150 days | DECEMBER 18, 1995 |
CCBPI SRPlant Rip-rapping & Fencing | Sta.Rosa,Laguna | 120 days | DECEMBER 21, 1995 | |
CCBPI SRPlant-Sports Facilities | Sta.Rosa,Laguna | 120 days | DECEMBER 27, 1995 |
Project Name | Location | Client Name / Contact Number | Duration | Complete Date |
---|---|---|---|---|
TWENTY(20) UNITS HOUSING | Ph 1C San Lorenzo South,Sta.Rosa | 45 days | JULY 1995 | |
RESIDENTIAL UNIT | Brgy.Putatan,Muntinlupa,Metro Manila | ADORACION DIANG | 90 days | JUNE 1994 |
FORTY FIVE(45) HOUSING UNITS | Ph 1C San Lorenzo South,Sta.Rosa | 90 days | AUGUST 1994 | |
PERIMETER FENCE-CHB with Cyclone Wire(Supply of Labor & Materials) | Brgy.Don Jose,Sta.Rosa,Laguna | 90 days | AUGUST 25, 1994 | |
GUARD HOUSE with Main Gate/Perimeter Fence/Streetsign/Drainage Cover | Brgy.Malitlit Sta.Rosa,Laguna | 100 days | NOVEMBER 1994 | |
CCBPI CALAMBA PLANT PRODUCTION-Drainage System | Calamba,Laguna | Coca Cola Bottlers Phils., Inc. | 120 days | NOVEMBER 1994 |
CCBPI CALAMBA PLANT Wooden Platform & Enclosure A.H.U | Calamba,Laguna | Coca Cola Bottlers Phils., Inc. | 60 days | NOVEMBER 1994 |
THIRTY FIVE(35) UNITS HOUSING | Ph 1C San Lorenzo South,Sta.Rosa | 90 days | SEPTEMBER 1994 | |
THREE(3) BEDROOM BUNGALOW | Brgy.Putatan,Muntinlupa,Metro Manila | HELEN BALDONADO | 90 days | DECEMBER 8, 1994 |
WAREHOUSE & CANTEEN | Banay-banay,Cabuyao,Laguna | 120 days | NOVEMBER 20, 1994 | |
TWO(2) STOREY APARTMENT-28 Units | Balibago,Sta.Rosa,Laguna | NIEVES ZAMUDIO | 150 days | DECEMBER 3, 1994 |
THREE(3) BEDROOM BUNGALOW | ATDRMAM Subdivision,Mayapa,Calamba | BRIGIDA MANUEL | 90 days | NOVEMBER 16, 1994 |
WAREHOUSE & PRODUCTION BLDG. | Muntinlupa,Metro Manila | 180 days | DECEMBER 8, 1994 | |
COOPS & HAULER WASHING | Brgy.Dita,Sta.Rosa,Laguna | 90 days | DECEMBER 20, 1994 |
Project Name | Location | Client Name / Contact Number | Duration | Complete Date |
---|---|---|---|---|
PECCO ASIA LIGHT INDL.-Erection of Steel Cladding/Roofing/Fencing/Supply of labor | Epza Cabuyao,Laguna | PECCO ASIA LIGHT INDL. | 120 days | FEBRUARY 1993 |
RAM FOOD CORPORATION WATER TREATMENT-Supply of labor,materials & equipment | Cabuyao,Laguna | RAM FOOD CORP. | 180 days | JUNE 1993 |
MAGNOLIA CORPORATION WATER TREATMENT-Lagoon/Supply of labor & materials/Sub-Contractor | Cabuyao,Laguna | MAGNOLIA CORP. | 180 days | JUNE 1993 |
MUN. OF CABUYAO-Police Precint & Outpost | Brgy.Marinig,Diezmo | 90 days | AUGUST 1993 | |
AFP-RETIREMENT & SEPARATION BENEFIT SYSTEM-Thirteen(13)Units Housing | San Lorenzo South,Sta.Rosa,Laguna | 90 days | OCTOBER 1993 | |
DCP CONSTRUCTION-Adelina Homes | Lipa City,Batangas | 100 days | NOVEMBER 1993 | |
FILSYN CORPORATION-Waste Water Treatment | Brgy.Don Jose,Sta.Rosa,Laguna | FILSYN CORP. | 120 days | DECEMBER 1993 |
Project Name | Location | Client Name / Contact Number | Duration | Complete Date |
---|---|---|---|---|
LARRY CARLOS RESIDENTIAL-Supply of labor & material,equipment | Alabang,Muntinlupa | LARRY CARLOS | 150 days | SEPTEMBER 1992 |
HUBBARD FEEDS WAREHOUSE-Supply of labor,materials & equipment | Sta.Rosa,Laguna | 180 days | OCTOBER 1992 | |
MR.LANDRITO APARTMENT-Supply of labor,materials & equipment | Alabang,Muntinlupa | MR.LANDRITO | 150 days | NOVEMBER 1992 |
NISSIN BISCUITS,INC.-Supply of labor,materials & equipment | Sta.Rosa,Laguna | NISSIN BISCUITS,INC | 90 days | NOVEMBER 1992 |
HONDA PHILIPPINES WAREHOUSE-Supply of labor,materials & equipment | Laguna Technopark | HONDA PHILIPPINES | 90 days | DECEMBER 1992 |